Challenge: Required stable 40% RH for API storage to meet regulatory standards. Solution: Installation of a high-capacity adsorption unit (Model X). Result: Stable RH maintained at 39-41%, eliminating product loss and passing the audit.
Challenge: Daily frost buildup on the evaporator, requiring costly defrost cycles. Solution: Integrated a specialized dehumidifier with the ventilation system. Result: Defrost cycles reduced to once per week. Operational savings: 75% on energy and maintenance.
Challenge: High seasonal humidity caused warping and damage to packaged paper products on a 10,000 m2$ storage floor. Solution: Installed four modular desiccant dehumidification systems. Result: Humidity stabilized below 50% RH year-round, cutting inventory losses by 90%.
Challenge: High condensation risk on sensitive turbine components during maintenance shutdowns, leading to corrosion. Solution: Deployed temporary/mobile high-efficiency desiccant dryers during planned outages. Result: Maintained a dew point below 5*C throughout the shutdown period, completely preventing corrosion.
How It Works
Site Audit & Data Collection
You submit your request. Our engineer analyzes the facility size, current conditions, and required dew point (or RH level).
Project Calculation & Proposal
We perform thermal calculation and select the optimal dehumidifier model and ventilation solution. We then provide a detailed commercial proposal.
Production & Logistics
Equipment manufacturing based on project specifications, quality control, and coordinated delivery to your industrial site.
Installation & Commissioning
Full installation, connection to existing systems, fine-tuning, and mandatory training for your technical personnel.
Start Your Project Today: Request a Free Calculation
Leave a request, and our engineer will contact you within 30 minutes to audit your site and select the optimal equipment.